Preparation: Preparing the floor to a professional standard is essential to achieve the best results. Fill all nail holes with a water based putty, allow to dry. Sand uncoated floor with 120-150 grade sandpaper or screen back on a flexible pad to ensure floor is uniformly dull with no sanding scratches, nibs or fur. Vacuum thoroughly. Take care to avoid scratching the surface.
Tools: 6mm mohair roller or applicator and a high quality brush.
1.Apply a liberal first coat of FASTASEAL 3535 Sealer (either single pack or two pack) using a 6mm mohair roller and good quality brush to cut in. Allow to dry for 1-2 hours’ single pack, 3 hours minimum for two pack
2. Sanding of FASTASEAL 3535 is not recommended. If FASTASEAL 3535 needs to be sanded due to contaminants or defects it could take up to 72 hours to fully dry, particularly in cold temperatures.
3. Apply a coat of DURAPOL (gloss only), POLYTHANE (gloss) or AQUAPRO. Allow to dry per instructions on the data sheet.
4. If further coats are required, sand floor with 150-180 grade sandpaper or screen back, remove all nibs, fluff and fur. Vacuum all dust.
5. Apply the final coat of DURAPOL (gloss or subdued gloss), POLYTHANE (gloss) or AQUAPRO (per datasheet directions).